Antony Hallagan Estimator
Carl Eaton Site Supervisor
Antony Hallagan Project Manager |
|
|
|
|
| | | | | | | | | | | | | |
|
CLIENT: Bovis Lend Lease CLIENT REP: Jim Neville CONTACT NO: (07) 3225 7100 ENGINEER: ARUP GEO-TECH: Golder Associates VALUE: $450,000 DURATION: May 2003 August 2003
|
|
 |
These works included site clearing, bulk excavation and removal of
35,000m3 shale rock and detailed excavation. Works were carried out in
conjunction with the shoring operation, works were carefully planned
and programmed so as to ensure timely and safe completion. The
excavation was up to 14m deep and included a 4.5m deep lift pit in the
middle of the site. In order to ensure stability, the perimeter
of the excavation was pre drilled thus providing a stable work face, on
completion of the excavation rock spall mesh was placed on the face of
the excavation for the safety of workers.
Traffic control was
paramount for the exiting of trucks onto busy Queen St, this was
completed without incident. Our contract also included a
stormwater diversion approx 45m in length which was completed out of
hours to the satisfaction of the Brisbane City Council.
|
|
 |
|
| | | | | | | | | | | | | |
| | |
 |
|
SHAMROCK TEAM:
Anthony Hallagan Estimator
Anthony Hallagan Project Manager
Jim Steward Site Supervisor
|
|
|
| | | | | | | | | | | | | |
| Garden City - Coles Relocation
|
|
CLIENT: JOHN HOLLAND CLIENT REP: Allan Brown CONTACT NO: (07) 3368 3144 ENGINEER: MPN (Greg Tyquin) VALUE: $1,000,000 DURATION: Dec 2002 Nov 2003
|
|
 |
Shamrock Civil were awarded the civil component of the Coles Relocation
at the busy Garden City Shopping Centre by John Hollands, this project
was staged so as to minimize disruption to trading. Stage 1 included
demolition of existing carpark, bulk excavation and detailed excavtion
including cutting down approx 300 piles. Stage 2 included stormwater
and approx 15,000m2 of pavements.
Works were completed in accordance with John Hollands various critical handover dates.
|
|
 |
|
|
| | | | | | | | | | | | | |
| |
 |
|
SHAMROCK TEAM:
Brendan Kealy Estimator
Brendan Kealy Project Manager
John Esler Site Supervisor
|
|
|
| | | | | | | | | | | | | |
Ipswich Recreation Centre - Collingwood Park
|
|
CLIENT: Walter Construction
CLIENT REP: Eddie Gangemi
ENGINEER: GHD Andrew Winters
VALUE: $220,000
DURATION: December 2002 June 2003
|
|
 |
Shamrock Civil were awarded the contract for the decontamination &
civil works at the new Ipswich Recreation Centre at Collingwood Park.
The site was formally used as a firing range which resulted in high
levels of lead, specialists were appointed to verify for unexploded
ordinates.
An extensive E&SC management plan was implemented to ensure minimal
run off from the site, these included cut off drains and a detention
basin.
We utilized a grid system for the systematic removal of contaminated
soil; each grid was verified on completion of excavation by GHD, all
material removed were placed in stockpile and covered with previously
stripped topsoil.
Following verification of the decontamination we undertook bulk earthworks and approx 5,000m2 of asphalt pavements.
|
|
 |
|
|
| | | | | | | | | | | | | |
| |
 |
|
SHAMROCK TEAM
Andrew Kerr Estimator/Project Manager
Paddy OBoyle Site Supervisor
Carl Eaton Site Supervisor/QA coordination
|
|
|
| | | | | | | | | | | | | |
Northlakes shopping Centre
|
|
CLIENT: Westfield Design & Construction CLIENT REP: Andrew Cosgrave CONTACT NO: (07) 3878 9300 ENGINEER: MPN Greg Tyquin (07 3371 8877) VALUE: $ 2,200,000 DURATION: November 2002 July 2003
|
|
 |
This contract included earthworks, storm water and electrical conduit installation. The major component of our works is included construction of approx 40,000m2 of flexible pavements, for the new Westfields Northlakes Shopping Centre. Pavements included heavy duty access roads, loading docks & intersections and light duty car park areas. Contract also included line marking and road furniture. Prior to completion we undertook the hard landscaping to the perimeter of the site. All works were completed in accordance with Pine Rivers Shire Council standards and MPN specifications. On completion of the project a Quality Manual was compiled, this included signed QV forms for the various components and stages as well as test certificates and as-constructed drawings.
|
|
 |
|
|
| | | | | | | | | | | | | |
| |