| St Stephens Cathedral Development |
|
CLIENT: John Holland Contractors CLIENT REP: David Marshall CONTACT NO: 0414 321483 ENGINEER: Butler Partners (Mike Neighbour) VALUE: $500,000 DURATION: March 2004 – January 2005
|
|
 |
Our contract included demolition of in ground structures, bulk excavation, underpinning, detailed excavation & backfilling. Due to the confined nature of the site and limited access, the works were carefully programmed to cause minimal disruption to church services and access to Charlotte St.
Approx 6,000m3 of rock was excavated and removed from site, excavations were staged so as to allow the shoring system an underpinning works to progress in accordance with program. |
|
 |
|
|
| | | | | | | | | | | | | |
| |
 |
|
SHAMROCK TEAM:
Andrew Kerr Estimator
Gareth Rhodes Project Manager
John Esler Site Supervisor
|
|
|
| | | | | | | | | | | | | |
|
CLIENT: PPK CLIENT REP: Greg Tyquin CONTACT NO: (07) 3371 6677 ENGINEER: MPN VALUE: $750,000 DURATION: October 2004 – March 2005
|
|
 |
Shamrock Civil were awarded the contract for the construction of a new Industrial Park at Richlands, the scope of works included site decontamination earthworks, services and pavements.
Decontamination works involved removal and disposal of asbestos contaminated soils in accordance the requirements of the EPA. This was followed by site earthworks including aprox 10,000m3 cut to fill to form road subgrade, building platforms and detention basins.
Service installations included stormwater, water, sewer, telecom and electrical reticulations. The project was finished off with hard landscaping, footpaths and an asphalt paved road.
|
|
 |
|
|
| | | | | | | | | | | | | |
| |
 |
|
SHAMROCK TEAM
Andrew Kerr Estimator
Derek Hennessy Site Supervisor
Callan Stephens Project Manager
|
|
|
| | | | | | | | | | | | | |
|
CLIENT: W.A. Stockwell Pty Ltd CLIENT REP: Shane Percy CONTACT NO: (07) 3033 9320 VALUE: $885,000 DURATION: April 2005 – November 2005 |
|
 |
The early works civil package for Tewantin consisted of bulk earthworks, bored piers with earth retention anchors and shotcrete to retain the perimeter of the excavation. A reinforced concrete capping beam was poured on top of the bored piers to lock in the retention system. Sewer & stormwater works within and external to the site were performed.
The project required detailed planning and programming to ensure the coordination of all works. Silt management was managed to comply with Noosa Shire Council’s requirements.
The project was completed on time and within the client’s budgetary constraints. |
|
 |
|
|
| | | | | | | | | | | | | |
| |
 |
|
SHAMROCK TEAM
Andrew Kerr Estimator
Gary Grace Site Supervisor
Callan Stephens Project Manager
|
|
|
| | | | | | | | | | | | | |
|
CLIENT: Construction Engineering CLIENT REP: Bradley Blanck CONTACT NO: (07) 5591 5491 VALUE: $914,000 DURATION: August 2004 - March 2005 |
|
 |
Shamrock Civil Engineering was appointed by Construction Engineering to do the following at the Coomera Tavern site: · Cut & fill over a site of approximately 16000m˛ · Drain & construct a new retention basin · Construct 2 pads for the Tavern & Restaurant and Bottle Shop · Construct car par for 400 cars · Rebuild new road, kerb & culvert All works were completed on time and to a high quality which met Construction Engineering’s standards.
|
|
 |
|
|
| | | | | | | | | | | | | |
| |
 |
|
SHAMROCK TEAM:
Antony Hallagan Estimator
John Esler Site Supervisor
Antony Hallagan Project Manager
|
|
|
| | | | | | | | | | | | | |
|
CLIENT: Brisbane City / Redland Shire Councils CLIENT REP: Peter Young CONTACT NO: (07) 3710 1128 VALUE: $530,000 DURATION: May 2005 - November 2005 |
|
 |
Shamrock were engaged by Redland Shire council to widen approximately 400 metres of Rickertt Road. Rickertt Road is a major council road with high traffic volumes. Works consisted of earthworks, pavements, kerbing and footpaths. The project required detailed planning to ensure safety and traffic flow, whilst construction took place. All the works were completed to a high specification & kept to program.
|
|
 |
|
|
| | | | | | | | | | | | | |
| |