ITB Gate 74 Pathway Extension

CLIENT:                  Brisbane Airport Corporation

VALUE:                   $175,000

DURATION:           April 2010 - May 2010

As principle contractor, Shamrock Civil Engineering was contracted by the Brisbane Airport Corporation to install:

  • 100 meter concrete pathway adjacent to the apron;
  • Guardrail and handrail along the kerb; and
  • Seven (7) lighting poles landside of the pathway and connected to the specified distribution board.

Working airside required strict adherence to the BAC conditions for working airside, which included:

  • Shamrock Civil's Site Supervisor having an Aviation Security Identification Card (ASIC) and providing fulltime supervision for the duration of the works;
  • A fulltime security guard with a Category 2 Authority To Drive Airside (ADA) to escort vehicles on and off site; and
  • For the duration of the works continuous monitoring and maintenance of the environmental conditions of the site ensuring compliance with Samrock Civil's approved Construction and Environmental Management Plan.